2010
Hazelton Prison
Hazelton, West Virginia

Crushing 200,000 tons of on-site sandstone into sub-base and drainage stones.
Hensel Phelps – General Contractor

2010
Curley Hollow Landfill- Cell Construction, Saint Paul, Virginia
250,000 tons of sandstone crushed into 1- ½” minus drainage layer material.
Ryan Central – General Contractor

2009
Savannah/Hilton Head Int’l Airport- Runway Reconstruction
Savannah, Georgia

100,000 tons of runway concrete crushed into sub-base material.
Head, Inc. – General Contractor

2009
Memphis Int’l Airport- Runway Reconstruction, Memphis, Tennessee
120,000 tons of runway concrete crushed into sub-base material.
AJAX Paving – General Contractor

2009
Route 19 Reconstruction
Asheville, North Carolina

120,000 tons of granite rock crushed into sub-base and select graded stones.
Taylor Murphy Construction & Young and McQueen – Joint Venture

2008- Present
Cave In Rock Quarry
Cave In Rock, Illinois

500,000 tons of limestone crushing into various stone sizes.
LaFarge North America – Operator

2008
I-75 Reconstruction
Macon, Georgia

125,000 tons of Highway concrete crushed into sub-base material
Archer Western Contractors – General Contractor

2008
I-64 Reconstruction Project
Battlefield, Virginia

60,000 tons of highway concrete crushed into sub-base material.
E.V. Williams – General Contractor

2007
Federal Correctional Institution, McDowell County, West Virginia
400,000 tons of sandstone crushing into subbase material.
Clark Construction – General Contractor

2006
Langley Air Force Base Taxiway Replacement, Virginia
100,000 tons of concrete crushing into subbase material.
Hi-Way Paving – General Contractor

2006
Crushing of concrete at various facility locations, Florida

840,000 tons of concrete crushing into subbase materials.
Independence Recycling of Florida – Owner

2006
MidCoast Aggregate Quarry Crushing, Webster, Florida
135,000 tons of limerock crushing into 3” minus subbase material.
Kiewit Southern – General Contractor

2006
Mittal Steel Slag Crushing, Cleveland, Ohio
580,000 tons of slag crushing into #57s, #8s, #10s and #304 materials.
Stein, Inc. – General Contractor

2006
West Virginia Air National Guard apron expansion, Martinsburg, West Virginia
Break, remove, truck and stockpile concrete for crushing.
165,000 tons of limestone and concrete crushing into subbase material.
Independence Excavating – General Contractor

2006
DiGeronimo Aggregates Quarry Crushing, Independence, Ohio
300,000 tons of shale crushing into 1-1/2” minus material.
DiGeronimo Aggregates – Owner

2006
New Deicing Facility, Cleveland Hopkins Airport, Ohio
Break, remove, truck and stockpile concrete for crushing.
125,000 tons of concrete crushing into subbase material.
Independence Excavating – General Contractor

2005
Marmet Dam Expansion, Charleston, West Virginia
82,000 tons of sandstone crushing into 3” minus subbase material.
Kokosing Construction – General Contractor

2004
SR-22 Highway Relocation, Mifflin County, Pennsylvania
550,000 tons of sandstone crushing into subbase material.
Walsh Construction – General Contractor

2003
Raleigh-Durham Airport Expansion, North Carolina
150,000 tons of concrete crushing into 3” minus fill material.
Lane Construction, Inc. – General Contractor

2003
Asheville Site Project, North Carolina
85,000 tons of granite crushing into subbase material.
Taylor & Murphy Construction – General Contractor

2003
Kelley’s Island Quarry Expansion, Ohio
250,000 tons of limestone crushing into subbase material.
Ohio Bulk – General Contractor

2003
SR-22/SR-119 Highway Relocation, Monroeville, Pennsylvania
100,000 tons of sandstone crushing into subbase material.
Dick Corp. – General Contractor

2002
Memphis Airport Runway Replacement, Tennessee
Break, remove, truck and stockpile concrete for crushing.
156,000 tons of concrete crushing into subbase material.
The runway was removed in 11 days, working double shifts.
Lane Construction, Inc. – General Contractor

2001
Grand Rapids Airport Runway Replacement, Michigan
Break, remove, truck and stockpile concrete for crushing.
285,000 tons of concrete crushing into subbase material.
John Carlo, Inc. – General Contractor

1999
Nashville Motor Speedway, Tennessee
1,200,000 tons of limestone crushing into subbase material.
Koester Construction – General Contractor

1998
Benedum Airport Expansion, West Virginia
90,000 tons of sandstone crushing into subbase material.
Mashuda Construction – General Contractor

1997
Tampa Airport Runway Replacement, Florida
Break, remove, truck and stockpile concrete for crushing.
145,000 tons of concrete crushing into subbase material.
John Carlo, Inc. – General Contractor